manpower scheduling中文
人力調配
例句與用法
- Develop a supportable piping project plan to include strategies and execution details for engineering design estimates equipment and manpower scheduling quality control / assurance construction / installation and start - up and commissioning
制定管道項目計劃,包括在工程設計,估算,設備和人力的規劃,以及質量保障,啟動和安裝的委托方面的戰略和實施的細節。 - Develop a supportable process project plan to include strategies and execution details for engineering design estimates equipment and manpower scheduling quality control / assurance construction / installation and start - up and commissioning
制定工藝項目進程計劃,包括在工程設計,估算,設備和人力的規劃,以及質量保障,啟動和安裝的委托方面的戰略和實施的細節。 - The fundamentals and basic flow of genetic algorithm are discussed in detail . associated with the production mode and characteristics of wall - paper industry , its production scheduling belongs to the hybrid flow shop ' s problem . applied based - on permutation coding genetic algorithm and used minimal production time as target function , it is solved the problem of low efficiency of wall - paper production equipments " utility that is caused by manpower scheduling and improved the production efficiency
2 )對生產調度問題的研究現狀和研究方法做了綜述和整理,深入探討了遺傳算法的基本原理和基本流程,并結合墻紙行業的生產模式和生產特點,指出其屬于混合flowshop問題,采用基于置換編碼的遺傳算法,并以最小生產時間作為目標函數,較好的解決了由人工調度帶來的墻紙生產設備使用效率偏低的問題,提高了生產效率。